RISK MANAGEMENT / SECOND SOURCE

Develop an alternative source through a controlled process.

A second source does not automatically reduce risk. It must be technically equivalent, documented and qualified through the required approval process.

Upload a drawing
01RISK02EQUIVALENCE03SAMPLES04APPROVAL
01

Understand the initial risk

Single-source tooling, long replacement lead times, high minimum order quantities, regional concentration, quality issues or a supplier exit require different second-source strategies.

02

Define technical equivalence

Not every historical supplier specification is fully captured in the drawing. Material, surface finish, parting lines, post-processing, packaging and inspection methods must be aligned before sampling.

03

Qualify through a controlled sequence

The RFQ, tooling decision, first articles, internal testing and series approval create a traceable path. A second source is ready only after customer approval.