Understand the initial risk
Single-source tooling, long replacement lead times, high minimum order quantities, regional concentration, quality issues or a supplier exit require different second-source strategies.
RISK MANAGEMENT / SECOND SOURCE
A second source does not automatically reduce risk. It must be technically equivalent, documented and qualified through the required approval process.
Upload a drawingSingle-source tooling, long replacement lead times, high minimum order quantities, regional concentration, quality issues or a supplier exit require different second-source strategies.
Not every historical supplier specification is fully captured in the drawing. Material, surface finish, parting lines, post-processing, packaging and inspection methods must be aligned before sampling.
The RFQ, tooling decision, first articles, internal testing and series approval create a traceable path. A second source is ready only after customer approval.
TECHNICAL ENQUIRY
Send the drawing, annual demand and reason for seeking a second source. We will structure the initial feasibility RFQ.