Drawing and revision control
We identify the agreed revision and resolve unclear requirements before manufacture. Engineering changes are reviewed for their effect on tooling, inspection, cost and delivery.

The drawing, material and inspection requirements form one controlled manufacturing package.
Request a Quote ↗
We identify the agreed revision and resolve unclear requirements before manufacture. Engineering changes are reviewed for their effect on tooling, inspection, cost and delivery.
Material grade, temper and certificate requirements are recorded at quotation. The required link between incoming material, production lot and delivery documentation is defined for the order.
The inspection plan identifies first-off, in-process and final checks, with suitable calibrated instruments. Critical characteristics and dimensional-report requirements are agreed before release.
Where a part needs CMM measurement or specialist inspection, the proposed measurement route is established during technical review, including external inspection when appropriate.
Suspect material and parts are identified and contained. Deviations require documented disposition; customer concessions are obtained where required before shipment.
APQP, PPAP, PFMEA, control plans, SPC and MSA requirements are reviewed with the customer. Required deliverables and responsibilities are agreed for each programme.
Share your material, quantity and delivery requirement. We’ll review the technical scope and prepare a quotation.
Request a Quote